Skip to content

Connecting Two Barns

Unrated
English

Language

Contribute a translation
Time limit
2000 ms
Memory limit
256 MB
Submissions
0
Correct
0
Solved by
0
AC rate

Statement

Farmer John's farm consists of a set of $N$ fields $(1 \leq N \leq 10^5)$, conveniently numbered $1 \ldots N$. Between these fields are $M$ bi-directed paths $(0 \leq M \leq 10^5)$, each connecting a pair of fields.

The farm contains two barns, one in field 1 and the other in field $N$. Farmer John would like to ensure that there is a way to walk between the two barns along some series of paths. He is willing to build up to two new paths to accomplish this goal. Due to the way the fields are situated, the cost of building a new path between fields $i$ and $j$ is $(i-j)^2$.

Please help Farmer John determine the minimum cost needed such that barns $1$ and $N$ become reachable from each-other.

Input

Each input test case contains $T$ sub-cases ($1\le T\le 20$), all of which must be solved correctly to solve the input case.

The first line of input contains $T$, after which $T$ sub-test cases follow.

Each sub-test case starts with two integers, $N$ and $M$. Next, $M$ lines follow, each one containing two integers $i$ and $j$, indicating a path between two different fields $i$ and $j$. It is guaranteed that there is at most one path between any two fields, and that the sum of $N+M$ over all sub-test cases is at most $5 \cdot 10^5$.

Scoring

  • Test case 2 satisfies $N \le 20$.
  • Test cases 3-5 satisfy $N \le 10^3$.
  • Test cases 6-10 satisfy no additional constraints.

Output

Output $T$ lines. The $i$th line should contain a single integer giving the minimum cost for the $i$th sub-test case.

Examples

Sample input 1
2
5 2
1 2
4 5
5 3
1 2
2 3
4 5
Sample output 1
2
1

Notes

In the first sub-test case, it is optimal to connect fields 2 and 3 with a path, and fields 3 and 4 with a path.

In the second sub-test case, it is optimal to connect fields 3 and 4 with a path. No second path is needed.

Tags

No tags yet

Source