Job Completion
English
Language
Contribute a translation- Time limit
- 2000 ms
- Memory limit
- 256 MB
- Submissions
- 0
- Correct
- 0
- Solved by
- 0
- AC rate
- —
Statement
Bessie the cow has $N$ ($1\le N\le 2\cdot 10^5$) jobs for you to potentially complete. The $i$-th one, if you choose to complete it, must be started at or before time $s_i$ and takes $t_i$ time to complete ($0\le s_i\le 10^{18}, 1\le t_i\le 10^{18}$).
What is the maximum number of jobs you can complete? Time starts at $0$, and once you start a job you must work on it until it is complete, without starting any other jobs in the meantime.
Input
The first line contains $T$, the number of independent test cases ($1\le T\le 10$). Each test case is formatted as follows.
The first line contains $N$.
Each of the next $N$ lines contains two integers $s_i$ and $t_i$. Row $i+1$ has the details for the $i$th job.
It is guaranteed that the sum of $N$ over all test cases does not exceed $3\cdot 10^5$.
Scoring
- Inputs 2: Within the same test case, all $t_i$ are equal.
- Inputs 3-4: $N\le 2000$, $s_i, t_i\le 2000$
- Inputs 5-8: $N\le 2000$
- Inputs 9-16: No additional constraints.
Output
For each test case, the maximum number of jobs you can complete, on a new line.
Examples
3 2 1 4 1 2 2 2 3 1 2 3 1 4 2 3 1 2
1 2 2
Notes
For the first test case, you can only complete one of the jobs. After completing one job, it will then be time $2$ or later, so it is too late to start the other job, which must be started at time $1$ or earlier.
For the second test case, you can start the second job at time $0$ and finish at time $2$, then start the first job at time $2$ and finish at time $5$.
Tags
No tags yet